CONSTRUCTION OF BUILDING PROCESS AND FOUNDATION

d to Building Foundation - 10 Steps

When constructing a foundation for a building, it is best to have any available Generally professional come in and do most of it the work. There are some skilled do-it-yourselves out there, though, lowest Properly can build a foundation for a small outbuilding. A civil engineer must to know the details of foundation construction as it's the basic work required for That Is Almost every construction project. The basic knowledge on building foundation construction process can help a homeowner to Understand the phase of construction. It requires specific steps to Ensure That the footings will hold the weight of the building-through the test of time.
Step By Step Guide For Building Foundation Construction

Building foundations are provided to carry the load of the structure and Then to distribute the load to the soil in larger cross sectional area. The foundation must be reliable to withstand the load of the structure Including live loads and environmental factors. A safety factor is provided for safety During foundation design. The foundation is Constructed según the design. Here are 10 steps are Generally That Followed During construction building foundation. The following steps are provided for a general idea. These are not fixed steps and steps can be varied many ways During practical Implementation Depending on the construction project.
No. 1 Survey and Stake Out Footprint
If you are building a basement for a Newly Constructed Home, you need to Understand construction process of your foundation before you can repair it to a high enough standard to create a room from the basement. Learning about the foundation construction process May Also help you to Understand especially the Weaknesses of the foundation, giving you clues for Where You Should begin the repairs.
Ground Work

Before the basement can be Positioned, you will need to start by digging the ground Where you want to go the basement. This Begins not by using an earth mover, but by testing the earth for compaction and grading the lot to Ensure That It is suitable for building. Then the earth movers dig large trenches, Which into the basement footings are placed.

Once the trenches are ready, place devices workmen called batter boards into the basement's floor. Batter boards Ensure That the building is Completely level. This work May take around a week to complete, from the very beginnings When the earth is dug up to the laying of the boards in place, and then a leaving the Entire area to September

Read more: http://www.doityourself.com/stry/the-foundation-construction-process-explained#ixzz3QHSCDaXx
Google Translate for Business:Translator Toolkit Website Translator Global Market Finder

building surveying

This step is completed by a professional Generally WHO surveyor will come out and determine the Appropriate distances from the property lines. This Ensures That the building will start out Correctly and to code. The corners of the building will be marked using surveyor's stakes. Then place the surveyor will offset stakes acerca two feet out from the surveyor's stakes. The digging for the foundation will be done using the offset stakes as the guides. This Allows for Extra room so the outside foundation walls can be Worked on.
No. 2 Excavation

Excavation for foundation building construction

A structural engineer will be needed to determine the depth of the excavation. All surface soil needs to be removed to expose the soil That is compacted enough to bear the weight of the building. The depth will vary per building. The top of the footing must be below the frost line as esta Prevents the concrete from cracking When the freeze-thaw cycle OCCURS in the soil surrounding the building.
No. 3 Footings
isolated Footing

isolated Footing

A footing is a Poured concrete pathway That is used to spread the weight of the building from the foundation walls to the soil. They are wider than the foundation walls That They are supporting and form the perimeter of the building. In some instances, there are additional added inside the perimeter footings to support load-bearing walls.
# 4 Sub Slab:

Generally, plumbing lines are run from the street to the building's basement by going over or even under the footing. This is even the case for buildings That Have Their Own Individual sewage facility or drain field. These lines are covered with a Poured concrete slab.
No. 5 Foundation Drainage System
foundation drainage tile